• +250 788 572 696
  • +250 788 304 329
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Projects

NIDA

When: March 2019 – May 2019

Status: Completed

Project description: Upgrading existing electrical installation

Deliverables:

  • New electrical installation and supply and installation of the main low voltage panel for the production house

When: 2016 & 2017

Status: Completed

Project description: ALTES has been engaged on an assignments as a subcontractor to provide various electrical structured cabling and air conditioning installation services for Bank of Africa at the Branches of Muhanga,Soras,KCM,Gikondo,Nyabugogo,Remera,and Extension of the main Branch at CHIC

Deliverables:

  • Electrical and structured cabling ,Security systems,   and AIR conditioning installations.

When: 2016

Status: Completed

Project description: Supply and installation of data center cooling units

Deliverables:

  • heavy duty air conditioning system for core site data center LOT1

When:2016

Status: Completed

Project description: Supply and installation of data center cooling units

Deliverables:

  • heavy duty air conditioning system for core site data center LOT1

When:2016

Status: Completed

Project description: Lightening protection istallation on 11 TIGO sites.

Deliverables:

  • Supply and installation of a complete lightening protection system with ESE technology for critical telecommunication TIGO sites.

When: 2016

Status: Completed

Project description: ALTES has been engaged on longer assignments by AB BANK to provide various electrical structured cabling and air conditioning installation services at the Branch and DR at MUSANZE

Deliverables:

  • Electrical and structured cabling ,AVR,UPS, generator and AIR conditioning installations.
  • Data center installations.

When: 2015 - 2019

Status: Completed

Maintenance contract .

Project description: ALTES has been engaged on longer assignments by GT BANK to provide maintenance services for electrical installations air conditioners and generators at all the branches, including headquarters and more practically to their main data center at HQ and their DR in MUHANGA.

Renewed contract, 2015 -2016

Status: Completed

Project description : Maintenance of generators of 8 branches of COGEBANQUE

Deliverables:

  • Periodical maintenance e services of standby generator of different sizes at different branches of the bank

When: renewed contract, 2015 -2016

Status: Completed

Project description : Maintenance of generators of 8 branches of COGEBANQUE

Deliverables:

  • Periodical maintenance e services of standby generator of different sizes at different branches of the bank

When: 2015-2016

Status: ongoing

Project description: ALTES has been a key supplier of electrical installation and maintenances services to UOB since 2008, both as a contractor and subcontractor. Branches where work has been completed include Kicukiro, Nyabugogo, Kimoronko, Rwamagana, Muhanga, Nyamata , Musanze,Ngoma,Huye and gisozi branches.

Deliverables:

  • Periodical maintenance services of electrical installation ,standby generator s and of different sizes and IT equipments at different branches of the bank