• +250 788 304 329
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Projects

When: 2017

Status: Completed

Project description: Supply and installation of data center cooling units

Deliverables:

  • heavy duty air conditioning system for core site data center LOT2

When: 2018

Status: Completed

Project description: ALTES provided this international Feeds Mill and trader with back bone electrical installation extension.

Deliverables:

  • Supply and installation of various electrical materials to supply power to the pallet plant which is an extension of the extension of the   existing mill…this included the remodel and extension of the backbone distribution together with the high bay lighting.

When: 2017

Project status: Completed

Project description: ALTES has been engaged on assignments by UOB to provide for services of design and construction of their new Disaster Recovery Data Center in MUHANGA including a raised floor.

Deliverables:

  • Electrical and structured cabling installations, data center equipments relocation from Kigali and reinstallation, air-conditioning complete with raised floor.

When: 2019 - 2022

Status: Completed

Project description: Facility maintenance services

Deliverables:

  • Mechanical, electrical & plumbing maintenance services for the whole campus complete with follow up on water purification system and the 15KW submersible water pumping system

When: 2017 Nov-Dec

Status: Completed

Project description: General maintenance of data center INROW cooling units

Deliverables:

  • 6 INROW cooling units repair and general maintenance for BPR DATA CENTER in MUHIMA and Disaster Recovery Site in RUHANGO.

NYANZA DISTRICT

When: Dec 2018 – May 2019

Status: Completed

Description: MV and LV Lines construction

Deliverables:

  • Construction of 6Km of high voltage line and 1.5Km Low Voltage line in Nyanza District Cyabakamyi IDP model Village

When: 2018 – 2019.

Length of project: Completed

Project description: MAINTENACE SERVICES DATA CENTER .

Deliverables:

  • Data center maintenance services for BPR DATA CENTER in MUHIMA and DESASTER RECOVERY SITE in RUHANGO this cover periodical maintenance and support their 4 cooling APC INROW cooling units and 160KVA SYMETRA-PX APC UPS in MUHIMA and 2 cooling APC INROW cooling units and 30KVA SUVT APC UPS in RUHANGO DR.

NIDA

When: March 2019 – May 2019

Status: Completed

Project description: Upgrading existing electrical installation

Deliverables:

  • New electrical installation and supply and installation of the main low voltage panel for the production house

When: 2018

Length of project: Completed

Project description: Lightening protection for new UNHCR HEAD OFFICE.

Deliverables:

  • Supply and installation of a complete lighting protection system with ESE technology with high standard structure earthing system near zero earth impendance.

GiSAGARA DISTRICT

When: 2019-2020

Status: Completed

Project description: Construction of 6 Km of public lighting

Deliverables:

  • Construction of 6Km of public lighting in 3 different business centers in Gisagara District.
Phone
+250 788 304 329
+250 788 572 696
Address
CHIC Building
2nd Floor, F029
KN 2 ave, Nyarugenge
Kigali - Rwanda
Email
info@altes.co.rw
© 2024 ALTES. All Rights Reserved.