Status: Completed
When: 2017
Description: Supply and installation of 50Kva AVR plus construction and connection of a low voltage commercial power line to the same site.
Deliverables: Supply and installation of 50Kva AVR complete with the construction and connection of a low voltage commercial power line at Rubengera core site.
Status: Completed
When: 2020
Description: ALTES has been engaged on assignments by UB to providing services of revamping and fitting to the new architectural designs of electrical and structured cabling installations for their HEAD quorters office,Remera branch,Kimironko branch and KCM branch.
Deliverables: Electrical and structured cabling installations, and air-conditioning.
Status: Completed
When: 2017
Description: Supply and installation of data center cooling units.
Deliverables: Heavy duty air conditioning system for core site data center LOT2.
Status: Completed
When: 2019 – 2022
Description: Facility maintenance services.
Deliverables: Mechanical, electrical & plumbing maintenance services for the whole campus complete with follow up on water purification system and the 15KW submersible water pumping system
When: 2019-2020
Description: GISAGARA DISTRICT – Construction of 6 Km of public lighting .
Deliverables: Construction of 6Km of public lighting in 3 different business centers in Gisagara District.
Status: Completed
When: 2017
Description: Supply and installation of slave & master generators 2x50Kva an 2x80Kva.
Deliverables: Supply and installation of slave & master generators with extra 2000 liter fuel tank 2x50Kva and 2x80Kva for Huye core site and Rubengera core site.