Projects

Urwego Opportunity Bank of Rwanda

 

When: Various projects since 2008 - ongoing
Length of project: 2-3 months each

Project description: ALTES has been a key supplier of electrical installation and maintenances services to UOB since 2008, both as a contractor and subcontractor. Branches where work has been completed include Kicukiro, Nyabugogo, Kimoronko, Rwamagana,  Muhanga, Nyamata , Musanze,Ngoma,Huye and gisozi branches.

Deliverables:
Design and install electrical, generator, air-conditioning and structured cabling.
Ongoing generator, AC, Printers, Photocopier and electrical maintenance.

Cogebanque

When: Various projects  2011 and 2012
Length of project: 3 months and 5 months

Project description: ALTES has been engaged on longer assignments by Coge to provide various electrical installation services at  several branches, including  Remera  Nyabugogo,Rubangura,and headquarters

Deliverables:
Electrical and structured cabling and generator installations.
Ongoing generator and electrical maintenance for Rubangura,Remera and Kabarondo  Branches.

MTN Rwanda

When: 2008
Length of project: 6months

Project description: Subcontractor to ETN installing key mast infrastructure  for regional telecommunication.   

Deliverables:
Provide for sites 'preliminaries establishment, technical logistics together with  technical human resources management and assess international standards compliance for technical works.

Parliament of Rwanda

When: Ongoing
Length of project: Ongoing

Project description: ALTES is the electrical and maintenance supplier for the key political building in Rwanda.

Deliverables:
Regular maintenance checks, of electrical and generator systems including air, water and fuel filter changes

Azam Industry

When: 2009
Length of project: 3months

Project description: Electrical consulting to architect responsible for the building.

Deliverables:
Designed electrical system drawings for building

Rwanda Trading Company

When: 2010
Length of project: 4 months

Project description: ALTES provided this international coffee trader with  design and electrical installation for their machinery plant.

Deliverables:
MLV and Control panel  design supply and installation
Supply and installation of various electrical materials  to supply power to different machines and equipments  for coffee processing.

Zamura Feeds

When: 2014
Length of project: 4 months

Project description: ALTES provided this international Feeds Mill and trader with back bone electrical design and electrical installation for their machinery plant.

Deliverables:
Generator and MLV panel  supply and installation
Supply and installation of various electrical materials  to supply power to different machines and equipments  for the mill.

GT Bank

When: 2014-2015

Maintenance contract .

Length of project: 1 year

Project description: ALTES has been engaged on longer assignments by GT BANK to provide maintenance services for electrical installations air conditioners and generators at all the branches, including headquarters

Access Bank

When: 2014-2015
 Electrical backbone distribution correction and upgrade,
Length of project: 3 months

Project description: Following the old and frequently faulty installations, ALTES has already  been engaged in the provision  of study  and implement an upgrade of the access bank electricity situated in the UTC  building

PARTNERS IN HEALTH/INSHUTI MU BUZIMA

When: SINCE      JANUARY -2015
 Modernizing the new Neonatology hospital

Length of project: 6 months

Project description: ALTES has been engaged in the provision of skilled labor for the installation of modern electrical infrastructures in the ongoing construction of new neonatology constructions in KIREHE districts.

NORWEGIAN PEOPLE’S AID (NPA)

 

When:  PPMA Project  2011  
Length of project: 3 months

Project description: ALTES staff have  been engaged on the assessment and installation of 245 house hold solar panels under PPMA project through he whole country . We worked with local NGO like ADTS, ADI TERIMBERE, ADENYA, RWANDA WOMAN NETWORK,…

Deliverables:

  • 245 Solar panels installed within the houses of focal beneficiaries.
  • Training on the maintenance of those to the beneficiaries

The Republic of German, province LENANI PARATINA

 

When: Various projects  2011  
Length of project: 3 months

Project description: study and installation of 2,5KW

Deliverables:
The project aimed at the installation of 2,5 KWp system. Including the solar modules, inverter systems, battery backups,..

And many more

 

  • Tulane University
  • UNAIDS
  • NELSAP
  • PWC
  • DELOITTE
  • NIDA(National Identification Agency)
  • Gashora Girls Academy
  • SNV
  • Co-Design
  • VFC (Vision Finance Company)
  • Fhi
  • Property Mode
  • Quest Africa
  • Meze Fresh Restaurant

info @altes.co.rw | +250 788 304 329 | Kigali - Rwanda